Sending a preliminary notice filing service
FILING A Notice

PRELIMINARY NOTICE DEADLINES

State Notice Name Deadline to File
California 20-Day Preliminary Notice
Oregon Notice of Right to a Lien
Washington Notice to Owner / Notice of Right to Claim Lien
Nevada Notice of Right to Lien
Idaho Not required / Residential Disclosure for qualifying residential general contractors.
Get Started

Why File a Preliminary Notice?

A preliminary notice is like insurance for the construction industry. Filing a preliminary notice at the start of a project protects your mechanics lien rights if a contractor or property owner fails to pay you.

Don’t risk your hard-earned money by missing a deadline or filing out a form incorrectly.

Northwest Lien handles the entire preliminary notice process for construction professionals in Washington, Oregon, Idaho, Nevada, and California, so you can focus on the job site.

Send A Notice Now
Why file a preliminary notice
Required notices

What notices do GCs need to provide?

State Required Notice(s) Timing/Key Rule
Washington Direct GCs generally do not need a Notice of Right to Claim Lien. Residential contractors may need to provide the required contractor disclosure.
Oregon Provide the Information Notice to Owner About Construction Liens for qualifying residential work.
Idaho Provide the required residential lien-disclosure statement and a later disclosure of certain unpaid subs and suppliers.
Nevada Direct GCs generally do not need a Notice of Right to Lien. A residential Notice of Intent to Lien may be required before filing.
California Direct GCs generally do not need a 20-Day Preliminary Notice. Home-improvement contracts must include required lien warnings.
Eligibility Check

Who Should Send a Notice

Mechanics lien laws generally require anyone who does not have a direct contract with the property owner to send a preliminary notice. We regularly process filings for:

  1. Subcontractors: Plumbers, electricians, framers, and roofers.
  2. Material Suppliers: Lumber yards, concrete suppliers, and wholesale distributors.
  3. Equipment Lessors: Companies renting out heavy machinery for the project.
  4. General Contractors: In some states, even GCs must send a specific notice to the owner to preserve their rights.
3 SIMPLE STEPS

How Our Notice Service Works

We designed our system to keep you out of the office and on the job site. Once you create an account, securing your lien rights takes just a few clicks:

  1. Submit Your Project Details: Send us the basic job info through our secure online portal (takes less than 5 minutes).
  2. We Do the Research: Our team verifies the property owner, general contractor, and lender information to ensure absolute accuracy.
  3. We File and Mail: We prepare the correct state-specific forms and send them via certified mail with tracking. You get a copy for your records and absolute peace of mind.
How Northwest Lien Service Help Contractors Get Paid
The Northwest Lien Advantage

Why Hire Northwest Lien for Your Notices?

Filing a preliminary notice construction form yourself takes time and leaves room for costly errors. Here is why contractors trust Northwest Lien:

  • Zero Guesswork: We ensure you are using the correct, up-to-date state forms for WA, OR, ID, NV, and CA.
  • Never Miss a Deadline: Oregon’s 8-day deadline and Washington’s 10-day residential deadline creep up fast. We track the dates and file on time.
  • 27+ Years of Local Experience: We understand and stay up to date with the nuances of regional mechanics lien laws.
  • Professional Delivery: We handle the certified mail and tracking required by state laws, so you have proof of delivery.
Talk To A Specialist

Check Your Deadline

Lien filing deadlines are strict and vary by state. Enter your details and we will tell you exactly how much time you have left.

"*" indicates required fields

Testimonials

Trusted by Contractors Across the West

FAQs

Frequently Asked Questions

What is the purpose of a preliminary notice?

A preliminary notice informs property owners, general contractors, and sometimes lenders that a contractor, subcontractor, supplier, or design professional is providing work or materials. Its goal is to protect potential lien rights and give owners insight into who is working on their project. It does not indicate a payment dispute or create a lien.

Can I file a mechanics lien without a preliminary notice?

In most cases, no. For the majority of subcontractors, material suppliers, and equipment lessors, sending a preliminary notice is a strict legal requirement. If you fail to send one, you generally forfeit your right to file a mechanics lien later. Even if you are a general contractor with a direct contract with the owner, sending a notice is still highly recommended and sometimes required by lenders.

Here is what happens if you skip the notice in our service areas:

  • Washington: If you do not have a direct contract with the property owner, you must send a notice to secure your rights. If you miss the 60-day commercial deadline or the strict 10-day residential deadline, you lose your right to claim a lien for any work done before that timeframe.
  • Oregon: Subcontractors and suppliers must send a Notice of Right to a Lien within 8 days of starting work. If you do not send it, your future mechanics lien will be invalid for any labor or materials provided before that 8-day window.
  • California: The 20-Day Preliminary Notice is mandatory for anyone who doesn’t have a direct contract with the owner. If you never send it, you have zero lien rights. If you send it late, your lien will only protect the work you did in the 20 days immediately preceding the late notice.
  • Nevada: Subcontractors and suppliers must send a Notice of Right to Lien within 31 days of first providing labor or materials. If you send it late, your lien rights will only cover the work and materials provided in the 31 days immediately before the late notice was delivered. If you never send it, you lose your lien rights.
  • Idaho: Unlike the other states, Idaho generally does not require subcontractors and suppliers to send a preliminary notice to secure lien rights, so skipping it will not typically invalidate your lien. However, general contractors on residential projects must provide a specific homeowner disclosure before starting work to fully protect their rights.

What happens if I miss the preliminary notice deadline?

If you miss the deadline, you generally lose your right to file a mechanic’s lien for the work done before the notice was sent. In California, for example, a late 20-day notice only protects the work done in the 20 days immediately preceding the late notice.

Do I need to send a notice if I have a great relationship with the contractor?

Yes. Sending a preliminary notice is a standard business procedure, not a threat. It informs all parties (including the property owner and lenders) that you are working on the project and protects your legal right to payment.

Is a preliminary notice an order or action?

No. A preliminary notice is not a court order, lawsuit, mechanics lien, or enforcement action. It is a required or recommended project notice that protects the sender’s right to take later action, such as recording a mechanics lien, if they are not paid. In California, for example, preliminary notice is generally a prerequisite to a valid lien claim for parties required to send one.

Can I just download a preliminary notice form and do it myself?

You can, but the rules are strict. If you send the form to the wrong party (like missing the lender in California) or use outdated language, your notice may be invalid. Northwest Lien stays up to date, so we file the correct document every time.